Hillside Pool

Archie Kapp Consulting / California Contractors License #288982 C-53
Phone (310) 550-6969       Fax (310) 859-7474              Contact by:
E-mail

Home
About Us
Hillside Pools
Buy CD
For Home Owners
For Architects
For Pool Builders
Case Studies
For General Contractors

 

7

The driller numbered each steel cage so it corresponded with each hole because all of the steel cages were different lengths. The different lengths were required to set up the deep and shallow areas of the pool to the correct finish depth. The cages needed to be guided in an exact way. The steel dowels tie in and it must all correspond with the structural design. There is nothing arbitrary.

If you like these case studies, you'll love our CD-ROM with 442 detailed photos and explanations  

Copyright © 2008 Archie Kapp Consulting/Eagle Vision Media. All rights reserved.