|
Shotcrete (gunite) completed. Here you can see the placement of the pool lights and positioning of the skimmers. We waited until the concrete cured to full strength before stripping the forms. It can take from 20 to 28 days. We check with the test lab for the results. If it cures to 3000PSI sooner we can strip the forms sooner. However as a precaution we will tell the Structural Engineer first to be sure it's OK with them.
|